Seidewitz Valley Bridge
|
June 1, 2005
October 21, 2005
|
Motorway bridge
|
Volume:
|
Predesign, final design, structural calculation and final planning
documents for free cantilevering of the arch using auxiliary stay
cables
|
Design period:
|
2003 / 2004 / 2005
|
Location:
|
BAB A 17, Dresden - Prag, Dohna, Saxony
|
Country:
|
Germany
|
Owner:
|
DEGES
|
Customer:
|
Ed. Züblin AG, Dresden
|
Arch span:
|
147,00m
|
Distance of the springing columns:
|
154,00m
|
Arch rise:
|
44,12m
|
Arch width:
|
2 x 6,50m
|
Alignment:
|
Straight arch and superstructure
|
Superstructure:
|
Composite structure
|
Width of superstructure:
|
2 x 15,00m
|
Foundation
|
Piles Ø 150cm and spread foundation
|
Arch construction:
|
Free cantilever method with auxiliary tie back cables
|
Special features:
|
Closing of the first arch on June 1st 2005
|
|
|